Lightweight partition board is simple and convenient, dry operation and prefabricated construction, reducing labor intensity, speeding up construction progress, and saving project cost, thus meeting the requirements of different customers for the indoor and outdoor environment of modern buildings, so it is in the actual light weight What to do in the operation of the partition board, let's talk about the installation method and precautions of its lightweight partition board.
The first is the necessary tools for installing lightweight partition boards, fixtures for fixing, hand hammers, crowbars with horizontal angle irons, board saws for woodworking, ruler boards, trowels, putty knives, small iron buckets , brushes, wooden wedges, light-weight energy-saving wall panels, adhesives, etc. are ready for use.
Lightweight Partition Panel Installation
1. According to the floor plan design, before the floor is hit the ground, pop up the wall panel position line and the door window position on the vertical wall and ceiling, clean the bonding part of the installation surface, and chisel the protruding part to level.
2. Use construction glue to mix cement and fine sand into a binder, mix well and mix it as needed. Storage time should not exceed 3 hours.
3. Before installing the wallboard, block and seal all the holes at both ends, and brush the water solution of construction glue and double water on the bonding surface (top surface and side surface).
4. Fill the groove with the mixed adhesive mortar, and then apply 150ml of reinforced adhesive tape on the upper, middle and lower sides of the raised edge after the wall panel is erected.
5. Push the wall board against the seam, and at the same time check whether the upper and lower positioning lines are horizontal and vertical. Adjust the board position to be aligned to achieve the bonding mortar and extrude the board seam, then press it with full force, and immediately plug the wood at the bottom in both directions. The wedge is tight, and the chainworker must do it well. Then use a knife to scrape the adhesive between the plates.
6. After installing the wall panels, use fine stone expansion concrete to seal the lower gap tightly and solidly. After it has strength (1 to 2 days), the wooden wedge can be taken out, and the cavity is filled with expansion mortar, and the light body partition wall Do not tick holes or drill holes within one week after the board is installed, so as to prevent the board from cracking due to insufficient curing schedule of the adhesive.
7. When splicing, the board seam should not exceed 5 mm, the vertical seam should be cleaned and scraped, and the construction glue should be brushed together. After bonding, the individual is not dense and then the same material is used to plug and scrape.